Arbeitsort: Finnland, Satakunta
Vertragsart: befristet Arbeitsplatz, Vollzeit

Benötigte Ausbildung:
Angebotener Lohn: keine Angaben
Anzahl der Arbeitsplätze: 1

Berufsfeld

Physiker, Mathematiker und Ingenieurwissenschaftler
   Architekten, ingenieure und verwandte Wissenschaftler
        Bauingenieure

Aufgabenbereich:

TVO is having the OL3 Nuclear Power Plant built by Areva and Siemens consortium and several of their subcontractors. We are now looking for the following professional to work for our client company Areva NP based in OL3 site: Final Documentation Engineer to take care of documentation procedures generated by subcontractors. This position is located on OL3 construction site and the estimated duration is approximately 12 months. The main duties include cleaning of metadata for End of Manufacturing Reports and End of Erection Reports. You will also take needed actions towards suppliers to gather possible missing documentation. Besides this, you will perform reporting of those reports and do the mapping of all EOMRs and EERs, as well as x-ray films. To succeed in this position, You need to be an engineer, with previous experience in gathering and analyzing information, as well as analyzing and reporting it. Besides this, You should have excellent communication skills and be fluent in English, both written and spoken. Proficiency in other languages, such as Finnish, German or French, is beneficial. Previous experience on Microsoft Office is mandatory, IT-based skills are highly appreciated. The ability to work as a part of a hectic multinational construction site is also required and as a person you should have an eye for details and be able to work on own initiative. We are offering you a challenging position with a competitive salary! This position will be filled as soon as the suitable candidate is found, so please don t hesitate to apply.

Arbeitszeit:

  • Ohne Arbeitszeitbestimmung

Anforderungen




source: https://www.ec.europa.eu/eures

  
     


zurück zur Suche